Build Your Agile Flow: Difference between revisions

From AgileMe
Jump to navigation Jump to search
(Created page with "Category:Agile:WorkshopsCategory:Agile ==Introduction== This exercise is related to Build Your Scrum Framework and allows leaders to build a diagram of a proposed Agile ecosystem for discussion. The workshop structure is based upon the 4 C’s framework described in Sharon Bowman’s Training From The Back of The Room (2009) (Bowman 2009). ==Learning Objectives== * Understand how an Agile ecosystem would exist in their organisation and gives rise to discussi...")
 
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[Category:Agile:Workshops]][[Category:Agile]]
[[Category:Agile:Workshops]][[Category:Agile]]
==Introduction==
==Introduction==
This exercise is related to [[Build Your Scrum Framework]] and allows leaders to build a diagram of a proposed Agile ecosystem for discussion. The workshop structure is based upon the 4 C’s framework described in Sharon Bowman’s Training From The Back of The Room (2009) (Bowman 2009).
This exercise is related to [[Build Your Scrum Framework]] and allows leaders to build a diagram of a proposed Agile ecosystem for discussion.  
 
The workshop structure is based upon the 4 C’s framework described in Sharon Bowman’s Training From The Back of The Room (2009) (Bowman 2009).


==Learning Objectives==
==Learning Objectives==
Line 7: Line 9:


==Materials==
==Materials==
<pdf width="300" height="500">File:BYO_Agile_Flow.pdf</pdf>


===If Using Tactile & Physical Media For Training===
===In-Person===
* Printed [[Media:BYO_Agile_Flow.pdf|agile flow shapes]] 1 per group
* Printed [[Media:BYO_Agile_Flow.pdf|Agile Flow shapes]] 1 per group
* Flip chart paper, 1 for each table group
* Flip chart paper, 1 for each table group
* Blu-tac or similar for sticking to the walls
* Blu-tac or similar for sticking to the walls
* Scissors
* Scissors


<pdf width="300" height="500">File:BYO_Agile_Flow.pdf</pdf>
===Distributed Online Working===
* [[Media:BYO_Agile_Flow_individual_shapes.pdf|Agile Flow individual shapes]] that can be used in collaborative infinite canvas boards or similar


==Workshop Flow==
==Workshop Flow==
Line 20: Line 24:
# Start by asking the attendees to split into table groups of 4 and to acquire the necessary materials to start for each table group.
# Start by asking the attendees to split into table groups of 4 and to acquire the necessary materials to start for each table group.


===Concepts (0 Minutes)===
===Concepts (10 Minutes)===
# Introduce the printed materials and have a brief discussion on the various items and what they stand for.
# Introduce the printed materials and have a brief discussion on the various items and what they stand for.


===Concrete Practice (25 Minutes)===
===Concrete Practice (25 Minutes)===
# Ask the attendees to construct their respective Agile flow using any means necessary e.g. using any web based resources they can find.
# Ask the attendees to construct their respective Agile flow diagram on a sheet of flip chart paper.


===Conclusions (15 Minutes)===
===Conclusions (15 Minutes)===
# Conclude with a show and tell with each table group presenting their models to the attendees
# Conclude with a show and tell with each table group presenting their posters to the attendees
# Facilitate any questions with the models
# Facilitate any questions with the models
# Finish up with a team share back to discuss their models
# Finish up with a team share back to discuss their models

Latest revision as of 06:20, 6 July 2023

Introduction

This exercise is related to Build Your Scrum Framework and allows leaders to build a diagram of a proposed Agile ecosystem for discussion.

The workshop structure is based upon the 4 C’s framework described in Sharon Bowman’s Training From The Back of The Room (2009) (Bowman 2009).

Learning Objectives

  • Understand how an Agile ecosystem would exist in their organisation and gives rise to discussions about particular aspects

Materials

load PDF

In-Person

  • Printed Agile Flow shapes 1 per group
  • Flip chart paper, 1 for each table group
  • Blu-tac or similar for sticking to the walls
  • Scissors

Distributed Online Working

Workshop Flow

Connections (5 Minutes)

  1. Start by asking the attendees to split into table groups of 4 and to acquire the necessary materials to start for each table group.

Concepts (10 Minutes)

  1. Introduce the printed materials and have a brief discussion on the various items and what they stand for.

Concrete Practice (25 Minutes)

  1. Ask the attendees to construct their respective Agile flow diagram on a sheet of flip chart paper.

Conclusions (15 Minutes)

  1. Conclude with a show and tell with each table group presenting their posters to the attendees
  2. Facilitate any questions with the models
  3. Finish up with a team share back to discuss their models

References

See Also